(Created page with " == Abstract == This paper presents a group maintenance scheduling case study for a water distribution network. This water pipeline network presents the challenge of maintain...")
 
m (Scipediacontent moved page Draft Content 936058738 to Li et al 2013b)
(No difference)

Revision as of 15:30, 14 October 2020

Abstract

This paper presents a group maintenance scheduling case study for a water distribution network. This water pipeline network presents the challenge of maintaining aging pipelines with the associated increases in annual maintenance costs. The case study focuses on developing an effective pipeline replacement planning for the water utility. Replacement planning involves large capital commitment and can be difficult as it needs to balance various replacement needs under limited budgets. A Maintenance Grouping Optimization (MGO) model based on a modified genetic algorithm was utilized to develop an optimum group maintenance schedule over a 20 year cycle. An adjacent geographical distribution of pipelines was used as a grouping criterion to control the searching space of the MGO model through a Judgment Matrix. Based on the optimum group maintenance schedule, the total cost was effectively reduced compared with the schedules without grouping maintenance jobs. This optimum result can be used as a guidance to optimize the current maintenance plan for the water utility.

Document type: Part of book or chapter of book

Full document

The PDF file did not load properly or your web browser does not support viewing PDF files. Download directly to your device: Download PDF document

Original document

The different versions of the original document can be found in:

Back to Top

Document information

Published on 01/01/2013

Volume 2013, 2013
DOI: 10.1007/978-1-4471-4993-4_15
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?