This paper presents a group maintenance scheduling case study for a water distribution network. This water pipeline network presents the challenge of maintaining aging pipelines with the associated increases in annual maintenance costs. The case study focuses on developing an effective pipeline replacement planning for the water utility. Replacement planning involves large capital commitment and can be difficult as it needs to balance various replacement needs under limited budgets. A Maintenance Grouping Optimization (MGO) model based on a modified genetic algorithm was utilized to develop an optimum group maintenance schedule over a 20 year cycle. An adjacent geographical distribution of pipelines was used as a grouping criterion to control the searching space of the MGO model through a Judgment Matrix. Based on the optimum group maintenance schedule, the total cost was effectively reduced compared with the schedules without grouping maintenance jobs. This optimum result can be used as a guidance to optimize the current maintenance plan for the water utility.
The different versions of the original document can be found in:
Published on 01/01/2013
Volume 2013, 2013
DOI: 10.1007/978-1-4471-4993-4_15
Licence: CC BY-NC-SA license
Are you one of the authors of this document?