(Created page with " == Abstract == Lockheed Martin Hanford Corporation (LMHC) is providing an overground transfer (OGT) system for use in saltwell pumping of the 241-S-Tank Farm. Fluor Daniel N...")
 
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
  
 
Lockheed Martin Hanford Corporation (LMHC) is providing an overground transfer (OGT) system for use in saltwell pumping of the 241-S-Tank Farm. Fluor Daniel Northwest (FDNW) was requested to support the effort by completing the design of the OGT system and completing the construction of the encasement pipe and encasement pipe support system. FDNW will also install the concrete shielding blocks for the OGT system. The shielding block system will provide a vehicle barrier for protection of the OGT line and will provide a radiation barrier for operations personnel. LMHC is responsible for the regulatory compliance of the entire transfer system. This installation instruction covers the encasement piping, pipe supports, heat tracing, thermal insulation, leak detectors, temperature indicators, and the shielding blocks. Installation of the primary (inner) pipe and associated equipment was completed at a previous time and the integrity of the primary piping will be confirmed by LMHC prior to operation of the system.
 
Lockheed Martin Hanford Corporation (LMHC) is providing an overground transfer (OGT) system for use in saltwell pumping of the 241-S-Tank Farm. Fluor Daniel Northwest (FDNW) was requested to support the effort by completing the design of the OGT system and completing the construction of the encasement pipe and encasement pipe support system. FDNW will also install the concrete shielding blocks for the OGT system. The shielding block system will provide a vehicle barrier for protection of the OGT line and will provide a radiation barrier for operations personnel. LMHC is responsible for the regulatory compliance of the entire transfer system. This installation instruction covers the encasement piping, pipe supports, heat tracing, thermal insulation, leak detectors, temperature indicators, and the shielding blocks. Installation of the primary (inner) pipe and associated equipment was completed at a previous time and the integrity of the primary piping will be confirmed by LMHC prior to operation of the system.
 
Document type: Report
 
 
== Full document ==
 
<pdf>Media:Draft_Content_116849268-beopen13-1631-document.pdf</pdf>
 
  
  
Line 18: Line 13:
 
* [https://digital.library.unt.edu/ark:/67531/metadc734014/m2/1/high_res_d/797663.pdf https://digital.library.unt.edu/ark:/67531/metadc734014/m2/1/high_res_d/797663.pdf]
 
* [https://digital.library.unt.edu/ark:/67531/metadc734014/m2/1/high_res_d/797663.pdf https://digital.library.unt.edu/ark:/67531/metadc734014/m2/1/high_res_d/797663.pdf]
  
* [https://core.ac.uk/display/71220342 https://core.ac.uk/display/71220342],[https://digital.library.unt.edu/ark:/67531/metadc734014 https://digital.library.unt.edu/ark:/67531/metadc734014],[https://academic.microsoft.com/#/detail/1978886592 https://academic.microsoft.com/#/detail/1978886592]
+
* [https://core.ac.uk/display/71220342 https://core.ac.uk/display/71220342],
 +
: [https://www.scipedia.com/public/HICKS_1999a https://www.scipedia.com/public/HICKS_1999a],
 +
: [https://digital.library.unt.edu/ark:/67531/metadc734014 https://digital.library.unt.edu/ark:/67531/metadc734014],
 +
: [https://academic.microsoft.com/#/detail/1978886592 https://academic.microsoft.com/#/detail/1978886592]

Latest revision as of 11:35, 22 January 2021

Abstract

Lockheed Martin Hanford Corporation (LMHC) is providing an overground transfer (OGT) system for use in saltwell pumping of the 241-S-Tank Farm. Fluor Daniel Northwest (FDNW) was requested to support the effort by completing the design of the OGT system and completing the construction of the encasement pipe and encasement pipe support system. FDNW will also install the concrete shielding blocks for the OGT system. The shielding block system will provide a vehicle barrier for protection of the OGT line and will provide a radiation barrier for operations personnel. LMHC is responsible for the regulatory compliance of the entire transfer system. This installation instruction covers the encasement piping, pipe supports, heat tracing, thermal insulation, leak detectors, temperature indicators, and the shielding blocks. Installation of the primary (inner) pipe and associated equipment was completed at a previous time and the integrity of the primary piping will be confirmed by LMHC prior to operation of the system.


Original document

The different versions of the original document can be found in:

https://www.scipedia.com/public/HICKS_1999a,
https://digital.library.unt.edu/ark:/67531/metadc734014,
https://academic.microsoft.com/#/detail/1978886592
Back to Top

Document information

Published on 01/01/1999

Volume 1999, 1999
DOI: 10.2172/797663
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?