Lockheed Martin Hanford Corporation (LMHC) is providing an overground transfer (OGT) system for use in saltwell pumping of the 241-S-Tank Farm. Fluor Daniel Northwest (FDNW) was requested to support the effort by completing the design of the OGT system and completing the construction of the encasement pipe and encasement pipe support system. FDNW will also install the concrete shielding blocks for the OGT system. The shielding block system will provide a vehicle barrier for protection of the OGT line and will provide a radiation barrier for operations personnel. LMHC is responsible for the regulatory compliance of the entire transfer system. This installation instruction covers the encasement piping, pipe supports, heat tracing, thermal insulation, leak detectors, temperature indicators, and the shielding blocks. Installation of the primary (inner) pipe and associated equipment was completed at a previous time and the integrity of the primary piping will be confirmed by LMHC prior to operation of the system.
The different versions of the original document can be found in:
Published on 01/01/1999
Volume 1999, 1999
DOI: 10.2172/797663
Licence: CC BY-NC-SA license
Are you one of the authors of this document?