(Created page with " == Abstract == This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in supp...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms. | This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 18: | Line 13: | ||
* [https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf] | * [https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf] | ||
− | * [https:// | + | * [https://core.ac.uk/display/71219162 https://core.ac.uk/display/71219162], |
+ | : [https://digital.library.unt.edu/ark:/67531/metadc735080 https://digital.library.unt.edu/ark:/67531/metadc735080], | ||
+ | : [https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf], | ||
+ | : [http://www.osti.gov/scitech/biblio/803652 http://www.osti.gov/scitech/biblio/803652], | ||
+ | : [https://academic.microsoft.com/#/detail/2271366538 https://academic.microsoft.com/#/detail/2271366538] |
This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.
The different versions of the original document can be found in:
Published on 01/01/2000
Volume 2000, 2000
DOI: 10.2172/803652
Licence: CC BY-NC-SA license