Abstract

This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.


Original document

The different versions of the original document can be found in:

https://digital.library.unt.edu/ark:/67531/metadc735080,
https://digital.library.unt.edu/ark:/67531/metadc735080/m2/1/high_res_d/803652.pdf,
http://www.osti.gov/scitech/biblio/803652,
https://academic.microsoft.com/#/detail/2271366538
Back to Top

Document information

Published on 01/01/2000

Volume 2000, 2000
DOI: 10.2172/803652
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?