(Created page with " == Abstract == This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in supp...")
 
m (Scipediacontent moved page Draft Content 171236227 to JULYK 2000a)
(No difference)

Revision as of 13:21, 26 October 2020

Abstract

This document provides a documented basis for the required design pressure rating and pump pressure capacity of the Hanford Site waste-transfer system in support of the waste feed delivery to the privatization contractor for vitrification. The scope of the analysis includes the 200 East Area double-shell tank waste transfer pipeline system and the associated transfer system pumps for a11 Phase 1B and Phase 2 waste transfers from AN, AP, AW, AY, and A2 Tank Farms.

Document type: Report

Full document

The PDF file did not load properly or your web browser does not support viewing PDF files. Download directly to your device: Download PDF document

Original document

The different versions of the original document can be found in:

Back to Top

Document information

Published on 01/01/2000

Volume 2000, 2000
DOI: 10.2172/803652
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?