Abstract

The HS2 Bromford Tunnel intermediate shaft has an external diameter of 21.9m and a depth to formation of 47.1m below ground surface. The shaft is formed with a 63.1m deep 1.5m thick diaphragm wall primary lining, with a cast in situ secondary lining. The shaft works started in spring [...]