Abstract

The construction of a permanent bridge required a temporary bridge parallel to the permanent bridge alignment. Preloading of the permanent bridge abutment occurred under a separate early earthworks contract. That fill was removed, and the temporary structure was constructed. The [...]

Abstract

The evaluation of in-situ behaviour, strength and compressibility of a soil profile is routinely performed by geotechnical engineers through field tests, such as the seismic piezocone penetration test (SCPTu), the flat dilatometer test (DMT) and the field vane shear test (FVT). This [...]