Abstract

West orebody is now the main production zone of Chambishi Copper Mine. Upward drift stoping is performed to meet the annual ore production of more than 1 Mt. Cemented classified tailings backfill was originally employed, which then proved to be both economically and operationally impractical due to high cement cost, low metal recovery, severe backfill tailings shortage, etc. As an alternative, the current paste backfill system with low cement addition was suggested after a comprehensive study and investigation. Construction work of the paste backfill system started in 2012. The system was put into production at the beginning of 2014 after commissioning. During commissioning, the backfill system reached a capacity of 60 m3/h with the paste concentration of 68 to 70%, and the friction loss of the pipeline transport was 4-6 MPa/km. To meet the backfill strength, the cement to tailings ratio for primary stopes was 1:12, and 1:30 for secondary stopes. As a result, the composite cost for backfill was only USD 15 to 20 /m3, while ore recovery increased by 35% and mining to cutting ratio dropped by 80 m3/kt. Since commissioning investigations indicate that this paste backfill system will be capable of prolonging west orebody’s service by about 10 years, and will bring about enormous economic returns. This paper presents the case study of the highly automated system and its commissioning performance, with emphasis on key processes including unclassified tailings thickening, two-stage slurry mixing, paste pumping, and underground backfill.


Original document

The different versions of the original document can be found in:

https://papers.acg.uwa.edu.au/p/1504_22_Xiuxiu,
https://academic.microsoft.com/#/detail/2753355905
Back to Top

Document information

Published on 01/01/2019

Volume 2019, 2019
DOI: 10.36487/acg_rep/1504_22_xiuxiu
Licence: CC BY-NC-SA license

Document Score

0

Views 3
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?