The harbour of Genova is currently protected by a breakwater barrier that is 4 km long. One of the ongoing PNRR projects in Italy consists in dismissing the current breakwater and rebuilding it farther away from shore. The new breakwater will extend to a length of over 6.2 km and allow large cargo and container ships with over 400 m length to access the harbour. The new breakwater will lie in the currently open and unprotected water of the Genova Bay, with water depths up to 50 m. An extensive in situ test campaign of CPT and DMT tests was carried out for soil characterization, to provide stratigraphy, deformability and strength parameters required for the design of the new breakwater foundations. The Manta seafloor penetrometer designed by Geomil was deployed with a crane, operating from a floating pontoon anchored in turn on each of the test locations. The fully automated version of the flat dilatometer (Medusa DMT) and a CPTU tip were alternatively pushed by the Manta, with penetration depths up to over 27 m from seabed. This paper presents results of the moduli obtained from DMT tests employing the standard Marchetti’ formulas and compares them with the interpretation from the CPT using different correlation factors. Additionally, the correlations between Bq (obtained from CPTU) and Ud (obtained from DMT) are analysed.
Published on 07/06/24
Submitted on 07/06/24
Volume Innovation in DMT & SDMT testing, 2024
DOI: 10.23967/isc.2024.124
Licence: CC BY-NC-SA license
Are you one of the authors of this document?