It is proposed that the reliability, operability, and flexibility of the Retrieval Transfer System be substantially upgraded by replacing the planned single in-farm pipeline from the AN-AY-AZ-(SY) Tank Farm Complex to the AP Farm with three parallel pipelines outside the tank farms. The proposed system provides simplified and redundant routes for the various transfer missions, and prevents the risk of transfer gridlock when the privatization effort swings into full operation.
The different versions of the original document can be found in:
Published on 01/01/1998
Volume 1998, 1998
DOI: 10.2172/344991
Licence: CC BY-NC-SA license
Are you one of the authors of this document?