Abstract

Post-earthquake reconstruction of the historic city Centre of L’Aquila, Italy, can be considered as the largest building site now under operation in Europe. The earthquake that hit the city of L’Aquila on the 6th April 2009 generated a so-called seismic crater that comprises 56 municipalities and concerns an area of almost 2.400 Km2. The earthquake of 2009 destroyed or severely damaged all historic buildings of the city Centre. Nowadays, in 2020 there are more than 8.000 completed construction projects that produced almost 4.000.000 t of removed rubble. The reconstruction process of L’Aquila has been soon defined as “the biggest construction site of Europe”. This experience of managing a huge number of construction projects in the same town highlighted the need of a multi-project coordination of the re-construction activities, and a central co-ordination office has been created. Problems concerning the co-ordination of many construction sites that are located very close to each-other are many and are related to the organization and sharing of different resources: space for tower cranes, access routes for vehicles, space for temporary scaffoldings and space for debris storage and disposal. The programme management of these production resources needs to be based on a General Management plan that is proposed. In particular, the problem of rubble production, transport and storage has been addressed in the plan proposition. In fact, the production, transportation and storage of rubble produced by construction operations can be considered one of the main criteria of the multi-project optimization process needed for the co-ordination of the city reconstruction. As a pilot study, a simulation of project co-ordination of an urban area that includes eleven building blocks under re-construction has been performed with the traditional resource levelling procedure. Therefore, the reconstruction programme schedule of the area has been optimized considering the process constraints due to quantitative limits of rubble transportation and disposal.

Full document

The PDF file did not load properly or your web browser does not support viewing PDF files. Download directly to your device: Download PDF document

References

[1] S. Di Marco, “Construction Site Planning for the Reconstruction of a Historic Earthquake City: the Case Study of L’aquila”, IN_BO, Vol. 13, pp. 82-93, (2018).

[2] L. Bosher, J. Meding, C. Johnson, F. Farmaz, K. Chmutina, Y. Chang-Richards, “Disasters and the Built Environment” 1st Edition, CIB Publication 410 (2016).

[3] Assessorato alla Ricostruzione e Pianificazione, Settore Pianificazione e Ripianificazione del territorio, Comune di L‟Aquila, Il Piano di Ricostruzione dei centri storici di L‟Aquila e Frazioni, L‟Aquila, 2011

[4] Angeletti P., Cherubini A., Cifani G., De Marco R., Ferrini M., Fish G., Iacovone D., Lemme A., Petrini V., Fabrizi V., Santoro C., Miozzi C., La Ricostruzione dei centri storici di L’Aquila e delle sue frazioni, L‟Aquila, 2013

[5] Criteri operativi per la programmazione della ricostruzione privata nei centri storici de comune di L‟Aquila, a cura dell‟Assessore Pietro Di Stefano, L‟Aquila, 2013.

[6] Protocollo di intesa Emergenza sisma Abruzzo 2009: ottimizzazione delle attività relative alle misure per la salute e sicurezza nei cantieri temporanei o mobili, L‟Aquila, 30 novembre 2009

[7] Libro bianco sulla ricostruzione privata fuori dai centri storici nei comuni colpiti dal sisma dell‟Abruzzo del 6 aprile 2009, a cura di Cineas, Fintecna e ReLUIS, L‟Aquila

[8] SISMA ABRUZZO 2009 – messa in sicurezza degli edifici monumentali: percorso metodologia e tecniche di intervento, atto di convegno, XIV Convegno ANIDIS: L‟ingegneria sismica in Italia, L‟Aquila, 2011.

[9] Linee guida per il rilievo, l’analisi e il progetto di intervento di riparazione e rafforzamento/miglioramento di edifici in aggregato, a cura di ReLUIS, L‟Aquila, 2010.

[10] Manuale Istruzioni – allegati Scheda di accompagnamento al progetto esecutivo ricostruzione per L‟Aquila, a cura dell‟Ufficio Speciale per la Ricostruzione di L‟Aquila, L‟Aquila, marzo 2013.

[11] Soluzioni logistiche e sostenibilità nella costruzione di grandi infrastrutture nei centri urbani: focus sulle esperienze in Emilia-Romagna, a cura di Giarandoni A, Atto di convegno, Bologna, 20 settembre 2017.

[12] Harris R. B. (1978) Precedence and Arrow Networking Techniques for Construction Wiley, New York U.S.

Back to Top
GET PDF

Document information

Published on 30/11/21
Submitted on 30/11/21

Volume Resilience of historic areas to climate change and hazard events, 2021
DOI: 10.23967/sahc.2021.190
Licence: CC BY-NC-SA license

Document Score

0

Views 4
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?