This study aims to provide a systematic overview and comparison of capital and O&M costs models for CO2 pipelines and booster stations currently available in literature. Our findings indicate significantly large cost ranges for the results provided by the different cost models. Two main types of capital cost models for pipeline transport were found in literature, models relating diameter to costs and models relating mass flow to costs. For the nine diameter based models examined, a capital cost range is found of, for instance, 0.8–5.5 M€2010/km for a pipeline diameter of 0.8 m and a length of 25 km. For the five mass flow based cost models evaluated in this study, a cost range is found of, for instance, 0.9–2.1 M€2010/km for a mass flow of 750 kg/s over 25 km (TRUNK-25). An important additional factor is that all capital costs models for CO2 pipeline transport, directly or indirectly, depend on the diameter. Therefore, a systematic overview is made of the various equations and parameter used to calculate the diameter. By applying these equations and parameters to a common mass flow, height difference and length result in diameters between 0.59 and 0.91 m for TRUNK-25. The main reason for this range was different assumptions about specific pressure drop and velocity. Combining the range for diameter, mass flow and diameter based cost models gives a capital and levelized cost range which varied by a factor 10 for a given mass flow and length. The levelized cost range will further increase if the discrepancy in O&M costs is added, for which estimations vary between 4.5 and 75 €/m/year for a pipeline diameter of 0.8 m. On top of this, most cost models underestimate the capital costs of CO2 pipelines. Only two cost models (namely the models who relate the costs to the weight of the pipeline) take into account the higher material requirements which are typically required for CO2 pipelines. The other sources use existing onshore natural gas pipelines as the basis for their cost estimations, and thereby underestimating the material costs for CO2 pipelines. Additionally, most cost models are based on relatively old pipelines constructed in the United States in the 1990s and early 2000s and do not consider the large increase in material prices in the last several years. Furthermore, key model characteristics are identified for a general cost comparison of CCS with other technologies and a system analysis over time. For a general cost comparison of CCS with other technologies, pipeline cost models with parameters which have physical or economic meaning are the preferred option. These are easy to interpret and can be adjusted to new conditions. A linear cost model is an example of such an model. For a system analysis over time, it is advised to adapt a pipeline cost model related to the weight of the pipeline, which is the only cost model that specifically models thickness of the pipeline and include material prices, to incorporate the effect of impurities and pipeline technology development. For modeling booster station costs, a relation between capacity and costs including some economies of scale seems to be the most appropriate. However, the cost range found in literature is very large, for instance, 3.1–3.6 M€2010 for a booster station with a capacity of 1.25 MWe. Therefore, validation of the booster station cost is required before such models are applied in further research.
The different versions of the original document can be found in:
Published on 01/01/2013
Volume 2013, 2013
DOI: 10.1016/j.ijggc.2013.01.005
Licence: Other
Are you one of the authors of this document?