Abstract

This paper presents a case study describing the impact of charging process of plug in hybrid vehicles (PHEV) and all electrical vehicles (EV) on the supply grid. The paper shows the distortion produced in the grid by the simultaneous charge of a large fleet of vehicles and the corrective actions taken to guarantee the Electromagnetic Compatibility with other loads in the same grid. The goal of the investigation was to establish a design guide for parking facilities.

Peer Reviewed


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1109/vppc.2010.5729217
http://upcommons.upc.edu/bitstream/handle/2117/12602/5737278.pdf;sequence=1,
http://yadda.icm.edu.pl/yadda/element/bwmeta1.element.ieee-000005729217,
https://academic.microsoft.com/#/detail/1990227896
Back to Top

Document information

Published on 01/01/2010

Volume 2010, 2010
DOI: 10.1109/vppc.2010.5729217
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?