The 100-B-24 Spillway is a spillway that was designed to serve as an emergency discharge point for the 116-B-7 outfall in the event that the 100-B-15 river effluent pipelines were blocked, damaged, or undergoing maintenance. The site meets the remedial action objectives specified in the Remaining Sites ROD. The results of confirmatory sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.
The different versions of the original document can be found in:
Published on 01/01/2006
Volume 2006, 2006
DOI: 10.2172/944438
Licence: CC BY-NC-SA license
Are you one of the authors of this document?