<jats:p>Baltic Marine Environment Protection Commission members seeking to implement MARPOL 73/78 Annex IV amendments which recognize the Baltic Sea as special are, in which discharge of uncommitted sewage from passenger ships is forbidden, must ensure that ports are equipped with adequate reception facilities. To ensure implementation of amendments of Annex IV in port of Klaipeda, the analysis framework model was defined by authors. The model evaluates the readiness of the port to changes brought by the amendments of MARPOL Annex IV. The scientific problem comes with perception of adequacy. Resolution MEPC.200(62) amending MARPOL 73/78 Annex IV states, that port reception facilities must be adequate to the needs of passenger ships using them without causing undue delay. Concept of adequacy is not defined, therefore other guidelines explaining adequacy were used: EU directive 2000/59/EC and IMO resolution MEPC.83(44) Guidelines for ensuring adequacy of port reception facilities. Based on these sources, criteria that must be met to ensure adequacy were identified and tested in article: 1) reception facilities meet needs of ships normally using them; 2) discharge of sewage does to cause undue delay; 3) reception facilities does not provide disincentive to use them; 4) facilities are accessible; 5) facilities contribute to the improvement of the marine environment.
Document type: Article
The URL or file path given does not exist.
The different versions of the original document can be found in:
Published on 01/01/2016
Volume 2016, 2016
DOI: 10.1515/ttj-2016-0030
Licence: Other
Are you one of the authors of this document?