Abstract

The objective of this project assessment was to provide real-time relief and reconstruction project information to interested parties in order to enable appropriate action, when warranted. Specifically, we determined whether: 1. Project results were consistent with original objectives; 2. Project components were adequately designed prior to construction or installation; 3. Construction or rehabilitation met the standards of the design; 4. The Contractor's Quality Control (CQC) plan and the U.S. Government's Quality Assurance (QA) program were adequate; and 5. Sustainability was addressed.

Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/334491677
Back to Top

Document information

Published on 24/04/06
Accepted on 24/04/06
Submitted on 24/04/06

Volume 2006, 2006
DOI: 10.21236/ada532207
Licence: CC BY-NC-SA license

Document Score

0

Views 0
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?