(Created page with " == Abstract == The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Wa...") |
m (Scipediacontent moved page Draft Content 860540473 to Bailey 1997a) |
(No difference)
|
The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel.
Document type: Report
The different versions of the original document can be found in:
DOIS: 10.2172/16874 10.2172/10148004
Published on 01/01/1997
Volume 1997, 1997
DOI: 10.2172/16874
Licence: CC BY-NC-SA license
Are you one of the authors of this document?