Line 4: | Line 4: | ||
The project guidelines will define the methodology for the design assessment, the performance criteria to be applied and recommendations for the construction of OWTP in FRP. | The project guidelines will define the methodology for the design assessment, the performance criteria to be applied and recommendations for the construction of OWTP in FRP. | ||
The report will also identify possible gaps and deviation for the certification | The report will also identify possible gaps and deviation for the certification | ||
+ | |||
+ | == Full Paper == | ||
+ | <pdf>Media:Draft_Sanchez Pinedo_703694743D4.7.pdf</pdf> |
The project guidelines will define the methodology for the design assessment, the performance criteria to be applied and recommendations for the construction of OWTP in FRP. The report will also identify possible gaps and deviation for the certification
Published on 13/06/24
Submitted on 13/06/24
Volume Public Deliverables, 2024
Licence: CC BY-NC-SA license
Are you one of the authors of this document?