In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure of the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection. | In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure of the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 18: | Line 13: | ||
* [https://digital.library.unt.edu/ark:/67531/metadc706817/m2/1/high_res_d/67748.pdf https://digital.library.unt.edu/ark:/67531/metadc706817/m2/1/high_res_d/67748.pdf] | * [https://digital.library.unt.edu/ark:/67531/metadc706817/m2/1/high_res_d/67748.pdf https://digital.library.unt.edu/ark:/67531/metadc706817/m2/1/high_res_d/67748.pdf] | ||
− | * [https://core.ac.uk/display/71141921 https://core.ac.uk/display/71141921],[https://digital.library.unt.edu/ark:/67531/ | + | * [https://core.ac.uk/display/71141921 https://core.ac.uk/display/71141921], |
+ | : [https://digital.library.unt.edu/ark:/67531/metadc624629 https://digital.library.unt.edu/ark:/67531/metadc624629], | ||
+ | : [http://www.osti.gov/scitech/biblio/67748-visual-radiological-inspection-pipeline-using-teleoperated-pipe-crawler http://www.osti.gov/scitech/biblio/67748-visual-radiological-inspection-pipeline-using-teleoperated-pipe-crawler], | ||
+ | : [https://academic.microsoft.com/#/detail/55768010 https://academic.microsoft.com/#/detail/55768010] |
In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure of the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.
The different versions of the original document can be found in:
Published on 01/01/1995
Volume 1995, 1995
DOI: 10.2172/104411
Licence: CC BY-NC-SA license
Are you one of the authors of this document?