==1 Scope of the study == | ==1 Scope of the study == | ||
Line 125: | Line 44: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 1'''. Planar bar linkages for space applications used or candidates for space ring deployable structures.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 1'''. Planar bar linkages for space applications used or candidates for space ring deployable structures.</span></div> |
==='''3.2''' Linear Deployable Structures=== | ==='''3.2''' Linear Deployable Structures=== | ||
Line 134: | Line 53: | ||
Once all the options were compared, and based on the project requirements, the unit cell selected for the deployment of both ring and linear structures has been determined to be composed of two consecutive V-folding rectangles with a common non-deployable side. The synchronization of both V-folding rectangles will be done via cables and pulleys. This cables and pulleys system can connect adjacent unit cells so a chain of unit cells can be built. These chains do not necessarily have to be coplanar. Figure 2 shows this unit cell. | Once all the options were compared, and based on the project requirements, the unit cell selected for the deployment of both ring and linear structures has been determined to be composed of two consecutive V-folding rectangles with a common non-deployable side. The synchronization of both V-folding rectangles will be done via cables and pulleys. This cables and pulleys system can connect adjacent unit cells so a chain of unit cells can be built. These chains do not necessarily have to be coplanar. Figure 2 shows this unit cell. | ||
− | + | [[File:Nieto_et_al_2018a-image6.jpeg|centre|600x600px]] | |
− | [[ | + | |
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 2.''' Unit Cell for the present project: Two parallel V-folding rectangles synchronized by cables and pulleys. </div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 2.''' Unit Cell for the present project: Two parallel V-folding rectangles synchronized by cables and pulleys. </span></div> |
Each V-folding is self-deployed by a spring. By this way, the deployment of the unit cell is passive. The need of active motorization is suppressed, and only a cable is needed to control the unit cell deployment. | Each V-folding is self-deployed by a spring. By this way, the deployment of the unit cell is passive. The need of active motorization is suppressed, and only a cable is needed to control the unit cell deployment. | ||
Line 152: | Line 70: | ||
Figures 3 to 5 show the deployable structures commented above. | Figures 3 to 5 show the deployable structures commented above. | ||
+ | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"></div> | ||
+ | [[File:Captura de pantalla 2022-10-11 172153.png|centre|742x742px]] | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | + | <span style="text-align: center; font-size: 75%;">'''Figure 3.''' Linear deployable structure composed of parallel chains of unit cells connected by rigid battens.</span></div> | |
− | + | [[File:Captura de pantalla 2022-10-12 122230.png|centre]] | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure | + | <span style="text-align: center; font-size: 75%;">'''Figure 4.''' Ring deployable structure composed of two chains of unit cells (one per semi-ring).</span></div> |
− | + | [[File:Captura de pantalla 2022-10-12 122332.png|centre]] | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | + | <span style="text-align: center; font-size: 75%;">'''Figure 5.''' Modular Structure deployment synchronised by three chains of linear unit cells | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
</div> | </div> | ||
Line 251: | Line 128: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 7.''' The three architectures considered: top-left: conical ring, top-right: cylindrical ring; bottom: double cylindrical ring</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 7.''' The three architectures considered: top-left: conical ring, top-right: cylindrical ring; bottom: double cylindrical ring</span></div> |
Three different diameters (6 m, 12 m and 24 m), were taken into account. Table 1 shows the mass efficiency of each configuration analysed for the same deployed stiffness requirements. | Three different diameters (6 m, 12 m and 24 m), were taken into account. Table 1 shows the mass efficiency of each configuration analysed for the same deployed stiffness requirements. | ||
− | |||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Table 1.''' Comparison of mass efficiency (kg/m<sup>2</sup>) of different ring configuration with the same deployed stiffness performance</div> | + | <span style="text-align: center; font-size: 75%;">'''Table 1.''' Comparison of mass efficiency (kg/m<sup>2</sup>) of different ring configuration with the same deployed stiffness performance</span></div> |
+ | [[File:Nieto_et_al_2018a-image19.png|centre|339x339px]] | ||
+ | |||
+ | |||
Other considerations, regarding accuracy, thermal stability, deployment reliability, storage efficiency, kinematic simplicity, number of equal parts and cost were taken into account and weighted. The simple cylindrical ring resulted to be more adequate for the purpose of this project. | Other considerations, regarding accuracy, thermal stability, deployment reliability, storage efficiency, kinematic simplicity, number of equal parts and cost were taken into account and weighted. The simple cylindrical ring resulted to be more adequate for the purpose of this project. | ||
Line 265: | Line 144: | ||
Once the unit cell and the linear architecture have been selected, unit cell requirements have been derived for the linear structures. The unit cell has been sized and designed according to these requirements and this unit cell has been assembled in order to build a 20 meter deployable linear structure. Figure 8 shows the modular deployable linear structure design in folded and deployed positions. | Once the unit cell and the linear architecture have been selected, unit cell requirements have been derived for the linear structures. The unit cell has been sized and designed according to these requirements and this unit cell has been assembled in order to build a 20 meter deployable linear structure. Figure 8 shows the modular deployable linear structure design in folded and deployed positions. | ||
− | + | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | |
{| | {| | ||
|- | |- | ||
Line 274: | Line 153: | ||
[[Image:Nieto_et_al_2018a-image22-c.jpeg|600px]] | [[Image:Nieto_et_al_2018a-image22-c.jpeg|600px]] | ||
+ | </div> | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 8.''' Linear Structure in folded, intermediate, and deployed positions.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 8.''' Linear Structure in folded, intermediate, and deployed positions.</span></div> |
The stiffness of the deployed configuration has been calculated, providing an eigenfrequency of 1.3 Hz. In order to fully accomplish with the structure requirements, the structure has been reinforced with cable crossings (in magenta in figure 9) in order to increase its stiffness. | The stiffness of the deployed configuration has been calculated, providing an eigenfrequency of 1.3 Hz. In order to fully accomplish with the structure requirements, the structure has been reinforced with cable crossings (in magenta in figure 9) in order to increase its stiffness. | ||
− | + | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | |
{| | {| | ||
|- | |- | ||
Line 286: | Line 166: | ||
| [[Image:Nieto_et_al_2018a-image24.png|center|330px]] | | [[Image:Nieto_et_al_2018a-image24.png|center|330px]] | ||
|} | |} | ||
− | + | </div> | |
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 9.''' Deployable linear structure first bending mode</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 9.''' Deployable linear structure first bending mode</span></div> |
This configuration provides an excellent deployment ratio between stowed and deployed length of less than 5%, which is a very promising value not only for this particular mission specification, but for longer masts. | This configuration provides an excellent deployment ratio between stowed and deployed length of less than 5%, which is a very promising value not only for this particular mission specification, but for longer masts. | ||
Line 296: | Line 176: | ||
Actuation margins of the deployment have been calculated according to ECSS-E-ST-33-01C, resulting in values higher than 1. | Actuation margins of the deployment have been calculated according to ECSS-E-ST-33-01C, resulting in values higher than 1. | ||
− | + | [[File:Nieto_et_al_2018a-image25.png|centre|600x600px]] | |
− | [[ | + | |
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 10.''' Reliability analysis with multibody dynamic simulation.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 10.''' Reliability analysis with multibody dynamic simulation.</span></div> |
Deployment accuracy (SRO) has also been assessed, providing values of 1.2 mm (6·10<sup>-5</sup> x Length). | Deployment accuracy (SRO) has also been assessed, providing values of 1.2 mm (6·10<sup>-5</sup> x Length). | ||
Line 308: | Line 187: | ||
The unit cell selected in paragraph 4 has been combined as in previous fig. 4 in a simple elliptical ring. Fig. 11 shows the deployed and semi-deployed status of this structure. | The unit cell selected in paragraph 4 has been combined as in previous fig. 4 in a simple elliptical ring. Fig. 11 shows the deployed and semi-deployed status of this structure. | ||
− | + | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | |
{| | {| | ||
|- | |- | ||
Line 317: | Line 196: | ||
[[Image:Nieto_et_al_2018a-image28-c.jpeg|108px]] | [[Image:Nieto_et_al_2018a-image28-c.jpeg|108px]] | ||
+ | </div> | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 11.''' Deployable ring structure, folded and deploying.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 11.''' Deployable ring structure, folded and deploying.</span></div> |
Ratio between the folded diameter and the deployed diameter is lesser than 10%, providing excellent perspectives regarding its launcher accommodation. | Ratio between the folded diameter and the deployed diameter is lesser than 10%, providing excellent perspectives regarding its launcher accommodation. | ||
The same kinds of friction, springs and cables have been introduced in the functional analyses, obtaining actuation margins higher than 1. Reliability of the deployment has also been checked by means of altering these characteristics, providing successful deployments. Fig. 12 shows a frame of one of these analyses. | The same kinds of friction, springs and cables have been introduced in the functional analyses, obtaining actuation margins higher than 1. Reliability of the deployment has also been checked by means of altering these characteristics, providing successful deployments. Fig. 12 shows a frame of one of these analyses. | ||
− | + | [[File:Nieto_et_al_2018a-image29.png|centre|600x600px]] | |
− | [[ | + | |
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 12.''' Multibody dynamic simulation of the ring deployment.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 12.''' Multibody dynamic simulation of the ring deployment.</span></div> |
Deployment accuracy (SRO) of the single ring has also been assessed, providing values of 0.42 mm. | Deployment accuracy (SRO) of the single ring has also been assessed, providing values of 0.42 mm. | ||
Line 340: | Line 219: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 13.''' Cable network integrated in the deployable ring structure.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 13.''' Cable network integrated in the deployable ring structure.</span></div> |
The stiffness of the designed reflector structure has been measured by means of a free-free modal analysis, resulting in a first eigenfrequency of 1.15 Hz, which mode can be seen in fig. 14. | The stiffness of the designed reflector structure has been measured by means of a free-free modal analysis, resulting in a first eigenfrequency of 1.15 Hz, which mode can be seen in fig. 14. | ||
Line 346: | Line 225: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 14.''' First eigenvalue of deployable reflector with integrated network.</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 14.''' First eigenvalue of deployable reflector with integrated network.</span></div> |
The mass of the designed reflector is less than 0.35 kg/m<sup>2</sup>. | The mass of the designed reflector is less than 0.35 kg/m<sup>2</sup>. | ||
Line 354: | Line 233: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 15.''' RMS error (m) distribution of the design faceted surface (global RMS=1.68 mm).</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 15.''' RMS error (m) distribution of the design faceted surface (global RMS=1.68 mm).</span></div> |
Concerning thermo-elastic stability, the RMS error of the deformed surface after best-fitting adjustment for the worst case (-170 °C) is 1.71 mm, as it can be seen in fig. 16. | Concerning thermo-elastic stability, the RMS error of the deformed surface after best-fitting adjustment for the worst case (-170 °C) is 1.71 mm, as it can be seen in fig. 16. | ||
Line 360: | Line 239: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Figure 16'''. RMS error (m) distribution after best-fitting adjustment for the worst thermo-elastic case (global RMS=1.71 mm).</div> | + | <span style="text-align: center; font-size: 75%;">'''Figure 16'''. RMS error (m) distribution after best-fitting adjustment for the worst thermo-elastic case (global RMS=1.71 mm).</span></div> |
==9 Resume of requirements== | ==9 Resume of requirements== | ||
Once the main features of the designed linear and ring structures has been shown, tables 2 and 3 present a summary of the main deployable structures requirements and the values obtained. | Once the main features of the designed linear and ring structures has been shown, tables 2 and 3 present a summary of the main deployable structures requirements and the values obtained. | ||
+ | |||
+ | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
+ | <span style="text-align: center; font-size: 75%;">'''Table 2.''' Resume of linear deployable structure requirements compliance (until today)</span></div> | ||
{| style="width: 100%;border-collapse: collapse;" | {| style="width: 100%;border-collapse: collapse;" | ||
Line 420: | Line 302: | ||
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | <div class="center" style="width: auto; margin-left: auto; margin-right: auto;"> | ||
− | '''Table | + | <span style="text-align: center; font-size: 75%;">'''Table 3'''. Resume of ring deployable structure with integrated network requirements compliance (until today)</span></div> |
{| style="width: 100%;border-collapse: collapse;" | {| style="width: 100%;border-collapse: collapse;" | ||
Line 475: | Line 357: | ||
− | + | ||
− | + | ||
==10 Conclusion and further works== | ==10 Conclusion and further works== |
Ftabla
The overall TRP activity scope is to design overall structural assemblies based on unit cells and develop representative part of deployable masts (linear structure) and rings (antenna or radiotelescope aperture).
The development covers the analytical predictions in combination with on-ground testing, and thereby also develops the verification methods. The expected development cost reduction of the modular architecture vs. non-modular is being quantified. Two different demonstrators models of deployable structures will be manufactured with due consideration to future mission needs: a linear structure to serve e.g. as baseline to carry a payload (e.g. reflector, instrument, antenna) on its tip and a ring type structure to serve as a backing structure for a reflector. The demonstrators will consist of a minimum of 6 modules.
A search among several future missions has been carried out, taking into account the following considerations:
With the purpose of selecting the most challenging solution, a single configuration, valid for both kind of mission scenario would be a 12 m reflector working in L-Band. Thus, the overall requirements are those of the Biomass Mission, but the more demanding RMS error to the best-fit paraboloid of the Inmarsat, which is an L-band working antenna.
A start of the art study has been performed, by means of analyzing current technologies that are being used for the deployment of linear and ring structures. Special attention has been paid on structures that are composed of unit cells that can potentially be used for both linear and ring structures. Structures that have been considered as non-modular or non-scalable have been discarded from the present study.
The study started with the ring deployable structures, as it has been considered that there are more unit cells used in this kind of structures that can be candidates for the deployment of both linear and ring structures.
Several deployable ring structures have been analyzed and compared in terms of modularity, scalabilty, mass, stiffness, overconstraining, reliability, friction and motorisation. Reference [1] shows several of the planar bar linkages for space deployable antenna structures than can be considered as unit cells. They have already been used in space applications or are being developed by European space companies. Some of them are shown in figure below and they are:
Additionally, other linear deployable structures such as the ADAM mast, FAST mast and COILABLE mast were analysed and compared in order to evaluate common points, pros and cons, and adaptability of the unit cells they are composed of to a ring deployable structure.
Once all the options were compared, and based on the project requirements, the unit cell selected for the deployment of both ring and linear structures has been determined to be composed of two consecutive V-folding rectangles with a common non-deployable side. The synchronization of both V-folding rectangles will be done via cables and pulleys. This cables and pulleys system can connect adjacent unit cells so a chain of unit cells can be built. These chains do not necessarily have to be coplanar. Figure 2 shows this unit cell.
Each V-folding is self-deployed by a spring. By this way, the deployment of the unit cell is passive. The need of active motorization is suppressed, and only a cable is needed to control the unit cell deployment.
The combination of a series of synchronised couples of V-fold rectangles can lead to different deployable structures, such as:
Figures 3 to 5 show the deployable structures commented above.
Figure 5. Modular Structure deployment synchronised by three chains of linear unit cells </div>
COMET and PROSIX have successfully developed and tested a 4 meter deployable ring with an inner cable network, demonstrating the viability of this unit cell, its synchronisation system, the possibility of combinations of these unit cells and the robustness and reliability of this kind of structures. Figure 6 shows the deployment test of a deployable conical ring structure, tested in December 2014.
The unit cell selected for the project has demonstrated to fulfil the deployed stiffness requirement of a deployable ring if this ring is considered in several configurations: a conical ring, a simple cylindrical ring and a double cylindrical ring. For that reason, a stiffness, feasibility, reliability and cost study was carried out in order to determine the ring optimum configuration in the range of deployment of the present project. Figure 7 shows some of the Finite Element Models used for the determination of the deployed structures eigen-frequencies:
Three different diameters (6 m, 12 m and 24 m), were taken into account. Table 1 shows the mass efficiency of each configuration analysed for the same deployed stiffness requirements.
Other considerations, regarding accuracy, thermal stability, deployment reliability, storage efficiency, kinematic simplicity, number of equal parts and cost were taken into account and weighted. The simple cylindrical ring resulted to be more adequate for the purpose of this project.
Once the unit cell and the linear architecture have been selected, unit cell requirements have been derived for the linear structures. The unit cell has been sized and designed according to these requirements and this unit cell has been assembled in order to build a 20 meter deployable linear structure. Figure 8 shows the modular deployable linear structure design in folded and deployed positions.
The stiffness of the deployed configuration has been calculated, providing an eigenfrequency of 1.3 Hz. In order to fully accomplish with the structure requirements, the structure has been reinforced with cable crossings (in magenta in figure 9) in order to increase its stiffness.
This configuration provides an excellent deployment ratio between stowed and deployed length of less than 5%, which is a very promising value not only for this particular mission specification, but for longer masts.
Friction, cables and other dynamic effects have been included in the functional analysis. Reliability of the deployment has also been assessed by means of dynamic multibody simulations, where the springs’ stiffness, friction coefficients and other factors have been altered obtaining successful deployments.
Actuation margins of the deployment have been calculated according to ECSS-E-ST-33-01C, resulting in values higher than 1.
Deployment accuracy (SRO) has also been assessed, providing values of 1.2 mm (6·10-5 x Length).
The unit cell selected in paragraph 4 has been combined as in previous fig. 4 in a simple elliptical ring. Fig. 11 shows the deployed and semi-deployed status of this structure.
Ratio between the folded diameter and the deployed diameter is lesser than 10%, providing excellent perspectives regarding its launcher accommodation.
The same kinds of friction, springs and cables have been introduced in the functional analyses, obtaining actuation margins higher than 1. Reliability of the deployment has also been checked by means of altering these characteristics, providing successful deployments. Fig. 12 shows a frame of one of these analyses.
Deployment accuracy (SRO) of the single ring has also been assessed, providing values of 0.42 mm.
One key factor to be thoroughly taken into account when analysing a deployable reflector is the effect of the cable network on it. A cable network has been designed for the deployable ring structure that can be seen in fig. 13.
The stiffness of the designed reflector structure has been measured by means of a free-free modal analysis, resulting in a first eigenfrequency of 1.15 Hz, which mode can be seen in fig. 14.
The mass of the designed reflector is less than 0.35 kg/m2.
Regarding the reflector accuracy, the reflecting surface is form by flat facets. The nodes position has been optimised for having the minimum possible RMS error with respect to the theoretical paraboloid surface with this number of facets. The global RMS error of the designed faceted surface is 1.68 mm. Figure 15 shows the facets RMS. It is interesting to mark that very good RMS values are obtained at the center of the reflector.
Concerning thermo-elastic stability, the RMS error of the deformed surface after best-fitting adjustment for the worst case (-170 °C) is 1.71 mm, as it can be seen in fig. 16.
Once the main features of the designed linear and ring structures has been shown, tables 2 and 3 present a summary of the main deployable structures requirements and the values obtained.
Requirement | Value Required | Goal | Achieved in this project (until today) | |
L1. Length | 20 to 50 m | 20 m | ||
L2. Mass | < 5 kg · m-1 | 1 kg · m-1 | 3.89 kg · m-1 | |
L3. Stowed Stiffness(1) | > 50 Hz | 55 Hz | ||
L4. Deployed Stiffness(2) | > 1Hz | 1.3 Hz | ||
L5. Accuracy (SRO) | < 2 mm | 0.2 mm | 1.2 mm | |
L6. Stability (under thermal conditions) | < 2 mm | TBD | ||
L7. Actuation Margin | > 1 | > 1 | ||
L8. Envelope | Accomodation in Vega/Proton | Accomodation in ADS E3000 platform with Proton, Falcon 9 and Ariane 5 Sylda A upper position | ||
(1) with HDRM concept | ||||
(2) with 6m offseted punctual mass of 120kg. |
Requirement | Value Required | Goal | Achieved in this project (until today) |
L1.Eliptical Geometry | D > 12m, d < 1.2m | D=20 m, d=0.9m | |
L2. Mass | < 1 kg · m-2 | 0.1 kg·m-2 | 0.35 kg · m-2 |
L3. Stowed Stiffness(1) | > 50 Hz | 52 Hz | |
L4. Deployed Stiffness(2) | > 1Hz | 1.15 Hz | |
L5. Accuracy (RMS) | < 2 mm (0-8m)
< 4 mm (8-12m) |
1.35 mm (0-8m)
2.11 mm (8-12m) | |
L6. Stability (RMS under thermal conditions) | < 2 mm | 1.71 mm | |
L7. Actuation Margin | > 1 | > 1 | |
L8. Envelope | Accomodation in Vega/Proton | Accomodation in ADS E3000 platform with Proton, Falcon 9 and Ariane 5 Sylda A upper position |
A unit cell has been selected for the common development of both linear and ring structures with very promising results. The simplicity and robustness of this unit cell is beneficially expanded to both deployable structures, resulting in lightweight, stable, accurate and robust products.
The number of common parts and mechanisms that are shared by both deployable structures foretells a cost decrease in their development.
The project is about to face Preliminary Design Review, where all the data provided in the present paper will be validated by ESA. Two breadboards will be manufactured and tested with the following aims:
[1] J. Santiago-Prowald, H. Baier. Advances in deployable structures and surfaces for large apertures in space. CEAS Space Journal. December 2013, Volume 5, Issue 3.
Published on 29/04/18
Accepted on 29/04/18
Submitted on 29/04/18
Volume 02 - Comunicaciones Matcomp17 (2018), Issue Num. 2 - Aplicaciones y compuestos multifuncionales, 2018
DOI: 10.23967/r.matcomp.2018.04.010
Licence: Other
Are you one of the authors of this document?