Abstract

Integrating sustainability in the road construction sector is omnipresent and is still gaining interest. This paper
specifically addresses the topic of environment-friendly and sustainable procurement of road works (Green
Public Procurement). The Belgian Road Research Centre has formed a national working group with members
from road administrations, road contractors, and sustainability experts.
The main objectives of this working group are to help road authorities (at the national and regional levels) in the
process of including sustainability indicators in their road tenders, with a view to achieving Green Public
Procurement in their road projects, and to keep abreast of new developments: European guidelines, best practices
in the sector, progress in other sectors such as the building industry, and certification in other sectors and in road
construction.
The aim is to define the most important sustainability (environmental-social-financial) indicators in the life cycle
of a road pavement, and use the evaluation of these to come to an overall assessment of the road’s sustainability
for use as a criterion in tendering. Pragmatic choices are made from the basket of sustainability indicators to
keep the methodology easy and simple yet objective, without aspiring to a full life cycle analysis.
A pilot project has been set up with global warming potential, the depletion of materials, noise, responsible
sourcing, road availability and annoyance to people, and direct construction costs as environmental, social and
financial indicators. Each of these is split up into sub-indicators (such as road transport, recycled contents, tyreroad
noise, or rolling resistance) that are all assessed by an easy procedure for both the contractor and the road
administration, respectively, thereby delivering and checking the sustainability information in the tender.
The evaluation leads to a single value, i.e., a weighted sustainability score. This score affects the actual tender
price in such way that direct costs as well as the sustainability score both determine which contractor wins the
bid.
The paper describes the implementation of the methodology in the pilot project.


Original document

The different versions of the original document can be found in:

https://zenodo.org/record/1446070 under the license http://creativecommons.org/licenses/by-nc-nd/4.0/legalcode
http://dx.doi.org/10.5281/zenodo.1446070 under the license http://creativecommons.org/licenses/by-nc-nd/4.0/legalcode


DOIS: 10.5281/zenodo.1446070 10.5281/zenodo.1446069

Back to Top

Document information

Published on 01/01/2018

Volume 2018, 2018
DOI: 10.5281/zenodo.1446070
Licence: Other