(Created page with " == Abstract == The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, repres...") |
m (Scipediacontent moved page Draft Content 226090268 to Silva et al 2014c) |
(No difference)
|
The development in power systems and the introduction of decentralized generation and Electric Vehicles (EVs), both connected to distribution networks, represents a major challenge in the planning and operation issues. This new paradigm requires a new energy resources management approach which considers not only the generation, but also the management of loads through demand response programs, energy storage units, EVs and other players in a liberalized electricity markets environment. This paper proposes a methodology to be used by Virtual Power Players (VPPs), concerning the energy resource scheduling in smart grids, considering day-ahead, hour-ahead and real-time scheduling. The case study considers a 33-bus distribution network with high penetration of distributed energy resources. The wind generation profile is based on a real Portuguese wind farm. Four scenarios are presented taking into account 0, 1, 2 and 5 periods (hours or minutes) ahead of the scheduling period in the hour-ahead and realtime scheduling.
The different versions of the original document can be found in:
Published on 01/01/2014
Volume 2014, 2014
DOI: 10.3182/20140824-6-za-1003.02541
Licence: CC BY-NC-SA license
Are you one of the authors of this document?