(Created page with " == Abstract == With the increasing number of vehicles in Yantai, the downtown traffic volume is increasing. Hongqi Road, the main road in Yantai exists the traffic congestio...")
 
m (Scipediacontent moved page Draft Content 922493963 to Cao Zhu 2016a)
 
(No difference)

Latest revision as of 04:59, 2 February 2021

Abstract

With the increasing number of vehicles in Yantai, the downtown traffic volume is increasing. Hongqi Road, the main road in Yantai exists the traffic congestion problems. Yantai Planning Bureau proposed to construct for viaduct this road. This design is mainly based on the planning and design of the elevated road in Yantai Hongqi Road (Hongqi Road intersection-Shanhai Road intersection). We used the VISSIM micro simulation system to carry out the simulation of the elevated road in Hongqi Road, and the stops and queue length are the evaluation indices for quantitative evaluation. Then through the evaluation indices and specific data obtained by simulation, we analyze the selection of the scheme and draw the final plan of the construction of the elevated road, which was provide a good reference for the planning and construction of Hongqi elevated road.


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/2274491117 under the license cc-by-nc
Back to Top

Document information

Published on 01/01/2016

Volume 2016, 2016
DOI: 10.2991/ifmeita-16.2016.3
Licence: Other

Document Score

0

Views 2
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?