(Created page with " == Abstract == Present Chinese big cities are facing one common problem that road resources have being occupied by the construction of traffic projects. In order to solve th...")
 
m (Scipediacontent moved page Draft Content 786193443 to Li et al 2015h)
 
(No difference)

Latest revision as of 20:43, 1 February 2021

Abstract

Present Chinese big cities are facing one common problem that road resources have being occupied by the construction of traffic projects. In order to solve the problems of traffic organization during construction properly, this paper put forward the research content and technical principle of municipal engineering projects traffic organization firstly, then suggest a method of traffic organization for viaduct according to the characteristics of the construction period that is divided into three stages (pipelines reconstruction renovation, substructure construction and superstructure construction), which was applied to Traffic organization scheme for construction period of Wuhan Road in Hankou, and it has achieved desired effect. Refer to traffic organization of Wuhan municipal projects under construction, other types of construction projects can be elevated to organize traffic reasonably and keep city traffic common operation, with the consideration of the project characteristics and the actual situation of traffic during construction. Keywords-municipal engineering projects ; under construction ; traffic organization ; traffic impact analysis ; Wuhan city.


Original document

The different versions of the original document can be found in:

https://academic.microsoft.com/#/detail/1639996731 under the license cc-by-nc
Back to Top

Document information

Published on 01/01/2015

Volume 2015, 2015
DOI: 10.2991/cmfe-15.2015.120
Licence: Other

Document Score

0

Views 0
Recommendations 0

Share this document

Keywords

claim authorship

Are you one of the authors of this document?