(Created page with " == Abstract == In order to adapt to traffic operation situation of over-saturated signalized intersection, the setting methods of optimal cycle and green split of every phas...") |
m (Scipediacontent moved page Draft Content 944219623 to Wang et al 2015j) |
(No difference)
|
In order to adapt to traffic operation situation of over-saturated signalized intersection, the setting methods of optimal cycle and green split of every phase are studied. Selecting Xinan Rd. and Wuyi Rd. intersection as study object, traffic investigation was carried out. Considering the two factors of the average delay and capacity at over- saturated intersection comprehensively, the optimization method of signal cycle length was proposed. Considering the traffic volume and queue length, setting method of the green splits of every phase was also proposed. Using the measured traffic data, signal timing scheme of the investigated intersection was not only designed, but also compared with the existing situation. The research indicates that, using this method, the average delay will be increased at over- saturated intersection, and the capacity can also be increased. This method is beneficial to reduce vehicles queuing at this kind of intersection.
The different versions of the original document can be found in:
Published on 01/01/2015
Volume 2015, 2015
DOI: 10.2991/lemcs-15.2015.10
Licence: Other
Are you one of the authors of this document?