(Created page with " == Abstract == Stringent environmental constraints are usually associated with or applied to the siting and installation of new pipeline facilities. This has resulted in a s...")
 
m (Scipediacontent moved page Draft Content 637788292 to Schulz et al 1991a)
 
(No difference)

Latest revision as of 18:05, 28 January 2021

Abstract

Stringent environmental constraints are usually associated with or applied to the siting and installation of new pipeline facilities. This has resulted in a significant portion of the design effort and ultimate cost of the facility to be dedicated to the mitigation of these environmental concerns. This paper describes how a compressor station can be designed and built such that stringent silencing requirements can be satisfied. The paper also references specific aspects of design which were successfully applied to the Parkway Compressor Station, Canada.Copyright © 1991 by ASME


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1115/91-gt-239
http://dx.doi.org/10.1115/1.2906651
https://proceedings.asmedigitalcollection.asme.org/proceeding.aspx?articleid=2197009,
https://asmedigitalcollection.asme.org/GT/proceedings/GT1991/79009/V003T07A009/241393,
https://academic.microsoft.com/#/detail/2174275509
http://gasturbinespower.asmedigitalcollection.asme.org/article.aspx?articleid=1418535,
https://academic.microsoft.com/#/detail/2062446000


DOIS: 10.1115/1.2906651 10.1115/91-gt-239

Back to Top

Document information

Published on 01/01/1991

Volume 1991, 1991
DOI: 10.1115/1.2906651
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?