(Created page with " == Abstract == Deadlines and late penalties are widely used to incentivize effort. Tighter deadlines and higher penalties induce higher effort, but increase the agent's risk...")
 
m (Scipediacontent moved page Draft Content 669373236 to Lewis Bajari 2014a)
 
(No difference)

Latest revision as of 18:22, 25 January 2021

Abstract

Deadlines and late penalties are widely used to incentivize effort. Tighter deadlines and higher penalties induce higher effort, but increase the agent's risk. We model how these contract terms affect the work rate and time-to-completion in a procurement setting, characterizing the efficient contract design. Using new micro-level data on Minnesota highway construction contracts that includes day-by-day information on work plans, hours worked and delays, we find evidence of ex post moral hazard: contractors adjust their effort level during the course of the contract in response to unanticipated productivity shocks, in a way that is consistent with our theoretical predictions. We next build an econometric model that endogenizes the completion time as a function of the contract terms and the productivity shocks, and simulate how commuter welfare and contractor costs vary across different terms and shocks. Accounting for the traffic delays caused by construction, switching to a more efficient contract design would increase welfare by 22.5% of the contract value while increasing the standard deviation of contractor costs—a measure of risk—by less than 1% of the contract value.


Original document

The different versions of the original document can be found in:

http://dx.doi.org/10.1093/restud/rdu002


DOIS: 10.1093/restud/rdu002 10.3386/w17647

Back to Top

Document information

Published on 01/01/2014

Volume 2014, 2014
DOI: 10.1093/restud/rdu002
Licence: CC BY-NC-SA license

Document Score

0

Views 1
Recommendations 0

Share this document

claim authorship

Are you one of the authors of this document?