(Created page with " == Abstract == The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pip...") |
m (Scipediacontent moved page Draft Content 150460455 to Capron 2008d) |
(No difference)
|
The 100-F-26:12 waste site was an approximately 308-m-long, 1.8-m-diameter east-west-trending reinforced concrete pipe that joined the North Process Sewer Pipelines (100-F-26:1) and the South Process Pipelines (100-F-26:4) with the 1.8-m reactor cooling water effluent pipeline (100-F-19). In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.
The different versions of the original document can be found in:
Published on 01/01/2008
Volume 2008, 2008
DOI: 10.2172/944195
Licence: CC BY-NC-SA license
Are you one of the authors of this document?