m (Scipediacontent moved page Draft Content 972693967 to Hall 1996a) |
|||
Line 3: | Line 3: | ||
This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines. | This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 18: | Line 13: | ||
* [https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf] | * [https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf] | ||
− | * [https://core.ac.uk/display/71173226 https://core.ac.uk/display/71173226],[https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf],[https://digital.library.unt.edu/ark:/67531/metadc674563 https://digital.library.unt.edu/ark:/67531/metadc674563],[https://academic.microsoft.com/#/detail/132951867 https://academic.microsoft.com/#/detail/132951867] | + | * [https://core.ac.uk/display/71173226 https://core.ac.uk/display/71173226], |
+ | : [https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf https://digital.library.unt.edu/ark:/67531/metadc674563/m2/1/high_res_d/492099.pdf], | ||
+ | : [http://www.osti.gov/servlets/purl/492099-14ZLSw/webviewable http://www.osti.gov/servlets/purl/492099-14ZLSw/webviewable], | ||
+ | : [https://digital.library.unt.edu/ark:/67531/metadc674563 https://digital.library.unt.edu/ark:/67531/metadc674563], | ||
+ | : [https://academic.microsoft.com/#/detail/132951867 https://academic.microsoft.com/#/detail/132951867] |
This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines.
The different versions of the original document can be found in:
Published on 01/01/1996
Volume 1996, 1996
DOI: 10.2172/492099
Licence: CC BY-NC-SA license
Are you one of the authors of this document?