m (Scipediacontent moved page Draft Content 189619576 to Saur Jalalzadeh 2010a) |
|||
Line 3: | Line 3: | ||
The new H2A Biomethane model was developed to estimate the levelized cost of biomethane by using the framework of the vetted original H2A models for hydrogen production and delivery. For biomethane production, biogas from sources such as dairy farms and landfills is upgraded by a cleanup process. The model also estimates the cost to compress and transport the product gas via the pipeline to export it to the natural gas grid or any other potential end-use site. Inputs include feed biogas composition and cost, required biomethane quality, cleanup equipment capital and operations and maintenance costs, process electricity usage and costs, and pipeline delivery specifications. | The new H2A Biomethane model was developed to estimate the levelized cost of biomethane by using the framework of the vetted original H2A models for hydrogen production and delivery. For biomethane production, biogas from sources such as dairy farms and landfills is upgraded by a cleanup process. The model also estimates the cost to compress and transport the product gas via the pipeline to export it to the natural gas grid or any other potential end-use site. Inputs include feed biogas composition and cost, required biomethane quality, cleanup equipment capital and operations and maintenance costs, process electricity usage and costs, and pipeline delivery specifications. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 18: | Line 13: | ||
* [https://digital.library.unt.edu/ark:/67531/metadc835328/m2/1/high_res_d/1000098.pdf https://digital.library.unt.edu/ark:/67531/metadc835328/m2/1/high_res_d/1000098.pdf] | * [https://digital.library.unt.edu/ark:/67531/metadc835328/m2/1/high_res_d/1000098.pdf https://digital.library.unt.edu/ark:/67531/metadc835328/m2/1/high_res_d/1000098.pdf] | ||
− | * [ | + | * [https://www.nrel.gov/docs/fy11osti/49009.pdf https://www.nrel.gov/docs/fy11osti/49009.pdf], |
+ | : [https://core.ac.uk/display/71273562 https://core.ac.uk/display/71273562], | ||
+ | : [https://www.scipedia.com/public/Saur_Jalalzadeh_2010a https://www.scipedia.com/public/Saur_Jalalzadeh_2010a], | ||
+ | : [http://www.osti.gov/servlets/purl/1000098 http://www.osti.gov/servlets/purl/1000098], | ||
+ | : [https://digital.library.unt.edu/ark:/67531/metadc835328 https://digital.library.unt.edu/ark:/67531/metadc835328], | ||
+ | : [https://academic.microsoft.com/#/detail/1579981796 https://academic.microsoft.com/#/detail/1579981796] |
The new H2A Biomethane model was developed to estimate the levelized cost of biomethane by using the framework of the vetted original H2A models for hydrogen production and delivery. For biomethane production, biogas from sources such as dairy farms and landfills is upgraded by a cleanup process. The model also estimates the cost to compress and transport the product gas via the pipeline to export it to the natural gas grid or any other potential end-use site. Inputs include feed biogas composition and cost, required biomethane quality, cleanup equipment capital and operations and maintenance costs, process electricity usage and costs, and pipeline delivery specifications.
The different versions of the original document can be found in:
Published on 01/01/2010
Volume 2010, 2010
DOI: 10.2172/1000098
Licence: CC BY-NC-SA license